Refresh Restyle

Start typing to search posts.

December 14, 2017

Fresh Start Day Designer

Home Interior

Hello friends! I don’t know about you but about this time each year I start thinking about how unorganized I was this year!? You too, well do I have something for you. I worked with a designer to create this beautiful Fresh Start Day Designer for you and me! A calendar that you can print out and use all year long. Fresh Start Day Designer

Each page is numbered, so if you drop by later in the year, just print the pages that you need. It’s printable in my brand colors but also looks beautiful in the black and white option to save ink at home. The link for the day designer is at the bottom of the post and it’s free! Plan on 2018 being the most productive year ever! Here’s an example of what’s inside: One Page Projects Planner Plan your projects, large and small. Project Planner Page A place for sketching plans - Project Sketch Page Month at a glance with large spaces for each day. Calendar with large area and notes

Thanks so much for following along on the blog. Please tag me in your projects, large and small on Facebook, I can’t wait to see them!

You can download your free copy of the planner here: Fresh Start Day Designer

Instructions for Printing: You can print this on your home printer. This file is designed for double-sided pages, but will work as single pages. The file can be taken on flash drive to Fed Ex, Staples, etc. and printed double sided or as single pages. They have several options to spiral bind it (Coil, Comb). You can also have them three hole punch it to place it in a 3-ring notebook. I recommend printing on 60 lb. paper so the text from the other side does not show through. (Minimum 24 lb.) I also recommend printing the front and back cover on card stock for durability. Pin It to share with your friends: 2018 Free Fresh Start Day Planner

Tags: DIY Projects, Free Printables

9 Comments

Archive
Nancy

Debbie, thank you so much for this awesome printable planner. Your design is absolutely perfect for my needs as a specialized renovation/repair/decor planner ... and being able to print each page as needed will certainly make my life much easier. You are a genius, my dear! :) Wishing you and your loved ones a wonderful Christmas and may 2018 be your best year ever! Hugs, Nancy

Debbie

Thanks so much Nancy!
Happy New Year,
Debbie

Norma Rolader

Thank you for the great download and the inspirations

Debbie

Thanks so much Norma!

Nancy

Debbie, Thank you for creating such a great planner. I have been using planners for decades and this is one of the best I have come across. Is there a way to print just the calendar? Thanks, Nancy

Erlene

This is wonderful! Thanks so much for sharing this printable planner on MM.

gail

Super download planner Debbie! I love it. I'm the world's worst planner and do best on digital options rather than good ole paper and pen. :)

Wishing you the happiest new year ever!

gail

Debbie

Thanks Gail!! I still love a paper planner and love to draw out my building projects, usually on a napkin or scrape piece of paper :) Maybe one day I will totally digital like you.
Happy New Year,
Debbie

Wilna Neethling-Smith

Wow, thank you for a great download.